Installation |
|
Sun-Mar Units are designed for easy Do-it
Yourself Installations Shipping cartons include (at no extra cost)
everything needed to install and operate the unit. |
|
Contents Of Shipping Carton The shipping carton on
all units:
|
|
Installing the Vent Stack
The vent kits included in the shipping carton are sufficient for installation in most single story buildings. If more is needed they are normally easy to find. 50mm pipe is PVC Central vacuum tubing, and 75mm and 100mm pipe is ABS sewer pipe.
These drawings show some of the more common vent stack
configurations.

Electrical Installation
All electric units are supplied with a power cord and pre-molded plug, which connects to a standard three (3) pin 220 Volt outlet and powers both the fan and heating element.
Toilet Installation
(Central
Units Only)
Central Composting toilet systems require a toilet in the bathroom to be connected to the composting unit. The following guidelines may be useful in planning this portion of the installation.
|
|
|
A typical installation with |
|
|
|
Toilet connected with waste piping dropping at 9mm to 12mm per meter. |
|
|
|
Installation with platform mounted Sealand 511 where height is a problem. |
One Pint Flush Toilet
Mount flush toilets to the floor with a 75mm diameter four (4) bolt flange supplied with pan.
Connect water at the rear of the toilet.
Connect 80mm waste pipe (not supplied) from the toilet to the composting unit. Piping should be either 45 degrees or more to the vertical, or 2º-3º (that is a drop of 9mm - 12mm per metre) so that the waste travels with the liquid.
Install multiple toilets by using a 'Y' fitting above the waste inlet of the composter.
Limit horizontal distance to 6m where possible. Units have been successfully placed over 12m away, although in such cases an extra weekly flush through may be needed, together with an easily accessed inspection port(s) within the waste pipe.
Dry Toilet
Bolt the Dry Toilet to the floor immediately above the waste inlet of the A/F unit. The toilet chute extends 100mm below the toilet base, so that it can sleeve into the 115cm long waste pipe piece, or directly into the waste inlet transition piece.
A second toilet is not recommended
when using a Dry Toilet
The 115cm long 25cm diameter pipe
piece supplied can be cut to size, so the toilet mounting surface can be anywhere
from 92-207mm above the surface the composter is placed on.
The maximum recommended height of the waste inlet pipe assembly is the the length of the pipe piece (115cm) plus the waste inlet transition piece (13cm) Adding additional pipe lengths, while possible, may make it more difficult to ensure there is a downdraft at the toilet seat.
For more detailed technical information regarding installation and operation please Click here